MGH Danvers MRI Replacement

Linea 5 was retained by MGH to design the replacement of their MRI at Mass General/North Shore Center for Outpatient Care in Danvers. The replacement of the MRI required the licensing of a temporary use MRI trailer to be used for the duration of the construction schedule so that MGH can maintain patient care. The project removed an approximately 15-year-old MRI from the existing scan room and replaced it with a new 1.5T GE MRI. The project included repairing the existing RF shielding, upgrading the MEP systems, refinishing the scan room and control room, and a new ambient lighting system. The new ambient lighting system was integrated into the control room and scan room to introduce color-changing light into the room allowing the patient to select calming colors that will ease their nerves for what can be a stressful procedure.

Danvers, MA
Completed in September 2022