NU Richards Hall Robotics lab
We are nearing completion of the Northeastern University Robotics lab in Richards Hall on the main campus. This summer slammer project converted a previously decommissioned animal facility on the 4th floor of Richards Hall in to a College of Engineering Robotics facility for three researchers, Prof. Taskin Padir, Prof. Peter Whitney and Prof. Sam Felton.
The time frame for this project was extremely compressed, having started construction in July to be completed by September 16. Significant abatement and complicated existing conditions made this a very complex project ion terms of logistics, especially considering all work needed to be completed from 6pm to 4am due to actively used classrooms on the floor below.
Engineer: RW Sullivan
Contractor: Shawmut Construction
The program consists of a Main Robotics lab which will have mobile benches and tool cabinets, a Manufacturing Facility for polymer casting, a prototyping room with shop type equipment, a mechanical room for the dedicated compressed air system and a storage room. In keeping with the College of Engineering directive of "Science on Display", a glass storefront was introduced along the corridor which will allow full visual access to the Testing and Display area at the entry to the main lab space.
The program consists of a Main Robotics lab which will have mobile benches and tool cabinets, a Manufacturing Facility for polymer casting, a prototyping room with shop type equipment, a mechanical room for the dedicated compressed air system and a storage room. In keeping with the College of Engineering directive of "Science on Display", a glass storefront was introduced along the corridor which will allow full visual access to the Testing and Display area at the entry to the main lab space.